Menu
Materiais Máquinas
Perspetivas
Artigos Vídeos Problema e solução
About
Sobre a Chembull Parceiros de média
Contacte-nos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Voltar a Problema e solução
Molds & Tooling 7 visualizações

Product cooling time too long and low production efficiency

Fenómeno do problema
Cooling time accounts for more than 75% of the molding cycle
Análise das causas
Mold cooling water channel design is unreasonable and cooling efficiency is low; the material has large crystallization heat and needs longer heat dissipation time; demolding temperature requirements are strict
Solução
Optimize cooling water channel layout and water flow parameters; adopt rapid heating and cooling (RHCM) technology; use high thermal conductivity mold materials (such as beryllium copper inserts)
Conclusão principal
Shortening cooling time is the most direct way to improve production efficiency
cooling timeproduction cycleRHCMberyllium copperwater channel optimization

Isto foi útil?

0 pessoas acharam isto útil

ChemAI