Molds & Tooling 8 visualizaciones

Product cooling time too long and low production efficiency

Fenómeno del problema
Cooling time accounts for more than 75% of the molding cycle
Análisis de la causa
Mold cooling water channel design is unreasonable and cooling efficiency is low; the material has large crystallization heat and needs longer heat dissipation time; demolding temperature requirements are strict
Solución
Optimize cooling water channel layout and water flow parameters; adopt rapid heating and cooling (RHCM) technology; use high thermal conductivity mold materials (such as beryllium copper inserts)
Conclusión clave
Shortening cooling time is the most direct way to improve production efficiency
cooling timeproduction cycleRHCMberyllium copperwater channel optimization