Molds & Tooling
8 visualizaciones
Product cooling time too long and low production efficiency
Fenómeno del problema
Cooling time accounts for more than 75% of the molding cycle
Análisis de la causa
Mold cooling water channel design is unreasonable and cooling efficiency is low; the material has large crystallization heat and needs longer heat dissipation time; demolding temperature requirements are strict
Solución
Optimize cooling water channel layout and water flow parameters; adopt rapid heating and cooling (RHCM) technology; use high thermal conductivity mold materials (such as beryllium copper inserts)
Conclusión clave
Shortening cooling time is the most direct way to improve production efficiency
¿Le ha resultado útil?
0 personas encontraron esto útil
¡Gracias por sus comentarios!