Molds & Tooling
5 görüntüleme
Product cooling time too long and low production efficiency
Sorun Belirtisi
Cooling time accounts for more than 75% of the molding cycle
Neden Analizi
Mold cooling water channel design is unreasonable and cooling efficiency is low; the material has large crystallization heat and needs longer heat dissipation time; demolding temperature requirements are strict
Çözüm
Optimize cooling water channel layout and water flow parameters; adopt rapid heating and cooling (RHCM) technology; use high thermal conductivity mold materials (such as beryllium copper inserts)
Temel Çıkarım
Shortening cooling time is the most direct way to improve production efficiency
Bu faydalı oldu mu?
0 kişi bunu faydalı buldu
Geri bildiriminiz için teşekkürler!