Injection Molding
7 visualizações
HDPE '2079851475616104452 sink marks
Fenómeno do problema
Depressions at thick-walled areas and behind ribs.
Análise das causas
High shrinkage + insufficient holding pressure compensation; the gate freezes too early.
Solução
①Increase holding pressure and time; ②enlarge the gate; ③rib thickness ≤60% of wall thickness; ④reduce material in thick walls.
Conclusão principal
Sink marks are tackled with both holding pressure and structural material reduction.