Menu
Materials Machinery
Insights
Articles Videos Problem & Solution
About
About Chembull Media Partners
Contact Us
Language
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Back to Problem & Solution
Injection Molding 2 views

PETG '2079851475616104452 low production efficiency, long cycle

Problem Phenomenon
The molding cycle is too long, cooling time accounts for a large proportion, and capacity is insufficient.
Cause Analysis
Cooling time too long, melt temperature high requiring longer cooling, mold cooling efficiency insufficient.
Solution
Lower the melt temperature to 220-240°C; optimize the mold cooling water channels to improve efficiency; use a low-temperature mold temperature controller.
Key Takeaway
PETG molding cycle optimization mainly starts from cooling efficiency.
PETGmolding cyclecooling efficiencymelt temperature

Was this helpful?

0 people found this helpful

ChemAI